City of Corcoran

A Hidden Gem Waiting To Be Discovered
Facebook Twitter
Beach sunset
 

Public Works and Parks Department

Hennepin County Road Maintenance and Construction Projects

 

Completed end of October -- Hennepin County Roads 10 and 50 Repaving/Restriping Project
Hennepin County, in coordination with city of Corcoran, is considering changing the intersection at Rebecca Park Trail to a standard 90 degree intersection, rather than its current skewed configuration. This will help increase the sight distance when approaching the intersection. A dedicated westbound left turn lane from County Road 10 onto Rebecca Park Trail would also be added. These two changes have a strong potential of reducing the number of crashes at this intersection. For complete information please visit www.hennepin.us/10and50Click on the link below for the proposed changes: 
 
In Progress -- Pinto Drive Reconstruction  Highway 55 and County Roads 115 and 116 in Medina
Construction is scheduled to begin in May 2017 and is expected to finish in October 2017. Project background Features of the reconstruction Signal replacement at the Highway 55 intersection Dual left turn lanes for southbound left turns on County Road 116 to a major source of morning traffic delays Realignment of Clydesdale Trail Replacement of the railroad crossing and signals and installation of a railroad quiet zone. Safer roadside facilities for pedestrians and bicyclists. For complete information please visit www.hennepin.us/residents/transportation/pinto-drive-medina. Click on the link below for the project layout:
 

 

For more information regarding transportation construction in Hennepin County, please call 612-596-9759. 



Corcoran Public Works Department

9100 County Road 19, Corcoran, MN
Pat Meister - Public Works Supervisor

Please call 763-420-2652 for questions or concerns.
Please leave your name, a phone number, your address and a brief message.

Or send an e-mail to - pw@ci.corcoran.mn.us
 

The Corcoran Public Works Department is an important part of maintaining the City's operation. This department consists of 5 full-time employees. Responsibilities include building maintenance, fleet service, park and public property maintenance / grooming, storm clean up and road and street repair. Roads require snowplowing in the winter and dust control /asphalt maintenance in the summer.

Listed below are links for more information:

8200 County Road 116, Corcoran, Minnesota 55340